Unit electric testing and punching are complete on all floors, and furnaces are operational in all units. On top of that, the wireless service install is ongoing! 

The pet spa fixture installation is complete on the main floor, and the countertop installation in the common areas is ongoing! The millwork installation for the amenity deck bar and seating areas, as well as the lobby is ongoing.

The fitness room equipment has been installed, as has the lobby wall tile above the fireplace and sink. The accent tile in our lobby will mimic the architectural detail that existed above the DuPage Theater's entrance.

On the 4th floor, the floor base installation in units and hallways is complete while the finish painting is still ongoing. The unit backsplash tile is also finished.

We can't wait to open and meet all our new residents! Return in April to read about our progress.

Follow us on our socials to see pictures and other information about Lilac Station!
FB: Lilac Station | Twitter: lilac_station | IG: lilacstationlombard


Leave a reply

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>